is designed for creating perforation channels in the casing, cement bond and rock perforating.
Features and advantages
- formation perforating without casing impacting;
- large-size perforated holes with a fine working edge;
- perforating during repair operations in multistring well sidewalls for annular space cementing;
- selective formation perforating of interlaced permeable and packed rock layers;
- thin bed drilling-in.
PS-112 drilling perforator may be used within the wells drilled with a 190-215.90 mm bit and cased with 146-168 mm casing pipes. It is to be run with logging unit and logging truck hoist equipped with a three-core logging cable up to 4,200 m long or a seven-core logging cable 5,400 m long.
Max. operating pressure, MPa |
80 |
Max. operating downhole temperature, °C |
150 |
Max. perforations quantity per trip |
up to 35 |
Instrument dimensions, mm: diameter length |
15 70 |
Power supply voltage, V |
380 |
Power consumption, kV·A |
up to 2.5 |
Reinforced tension capability at the cable head zone for emergency tool breakout, kg |
500 |
Downhole tool dimensions, mm: diameter length |
112 2350 |
Weight, kg: downhole tool delivery set |
80 135 |
The examples of productive formation opening-up
Opening-up method impact on formation productivity